![]() |
| walkway from carport to kitchen |
| patio for guest bedroom |
![]() |
| walkway from driveway to front door |
![]() |
| The City approach and sidewalk replaced (where damage occurred from sewer line replacement) |
| The City approach and sidewalk replaced (where damage occurred from sewer line replacement) |
f |
| front steps |
| front steps |
| street entrance |
![]() |
| baster bathroom door, and outside shower |
| master bathroom door, and outside shower |
![]() |
| master bedroom patio |
| master bedroom patio |
![]() |
| 6:30AM: the concrete arrives |
![]() |
| the pour begins |
![]() |
| The City approach and sidewalk require a larger aggregate concrete |
![]() |
| an end to a long day! |
![]() |
| 3 days later... master bath step-out and outdoor shower |
![]() |
| 3 days later... front steps |
![]() |
| View from above: master bedroom patio |
![]() |
| View from above: front steps |
![]() |
| View from above: walkway connecting driveway and front door |
![]() |
| View from above: guest bedroom patio |
![]() |
| View from above: walkway from carport to kitchen |



f
























No comments:
Post a Comment