![]() |
walkway from carport to kitchen |
patio for guest bedroom |
![]() |
walkway from driveway to front door |
![]() |
The City approach and sidewalk replaced (where damage occurred from sewer line replacement) |
The City approach and sidewalk replaced (where damage occurred from sewer line replacement) |
![]() |
front steps |
front steps |
street entrance |
![]() |
baster bathroom door, and outside shower |
master bathroom door, and outside shower |
![]() |
master bedroom patio |
master bedroom patio |
![]() |
6:30AM: the concrete arrives |
![]() |
the pour begins |
![]() |
The City approach and sidewalk require a larger aggregate concrete |
![]() |
an end to a long day! |
![]() |
3 days later... master bath step-out and outdoor shower |
![]() |
3 days later... front steps |
![]() |
View from above: master bedroom patio |
![]() |
View from above: front steps |
![]() |
View from above: walkway connecting driveway and front door |
![]() |
View from above: guest bedroom patio |
![]() |
View from above: walkway from carport to kitchen |
No comments:
Post a Comment