May 16, 2012

Oops...

The driveway is still tore up from the sewer line replacement.  During a recent delivery, a box-truck got stuck in the soft sand.  His tires stopped in the perfect place, and the diameter of the removed concrete section was a perfect fit.  Oops.  To alleviate this problem (until construction is completed and the driveway repaired) we have placed some 2x6 boards down.






No comments:

Post a Comment