Apr 3, 2012

New Slab Pouring


ARRIVAL: 6:45 AM
 

wet concrete is pumped thru this hose to the backyard

Footings are poured first



 

Slab is poured next to create one monolithic assembly

Two mixing truck deliveries, and the pouring was completed in about 60 minutes

The rest of the morning was spent smoothing and detailing

VOILA: 1:00 PM